40 MMSCFD CRYO GAS PLANT (Train 2)
€1.298.139,95 EURUnit price /Unavailable40 MMSCFD CRYO GAS PLANT (Train 1)
€1.298.139,95 EURUnit price /Unavailable
Additional Information
Typical Configuration Includes:
Typical Configuration Includes:
- Inlet separation and gas conditioning
- Turbo expander / compressor package
- Demethanizer column
- Residue gas compression
- Heat exchangers (cold box)
- NGL handling and stabilization
Common Operating Range:
Common Operating Range:
Capacity: ~10–500+ MMSCFD
Pressure: Typically 600–1,200+ psi inlet
Recovery:
- Ethane: Rejection → 90%+ recovery (config dependent)
- Propane+: 95–99%+ recovery achievable
Applications:
Applications:
- Rich gas processing and NGL recovery
- Midstream gas plants
- Integration with downstream fractionation systems
- Ethane recovery or rejection based on market conditions
Engineering Considerations:
Engineering Considerations:
- Inlet gas composition and pressure profile
- Required recovery levels (ethane vs propane+)
- Integration with dehydration and treating upstream
- Downstream fractionation and product handling
- Control strategy and operational flexibility